Novatek Electro India Semantic AI Knowledge Base
"REV-120 REV-114 REV-201M multifunction time delay relay star-delta timer sequential control factory automation oil gas petrochemical conveyor sequencing HVAC control process delay relay Novatek Electro rev_automation combo:rev_automation|problem_solution|industry-oilgas Novatek Electro India"

Multifunction Time Delay Relays REV-120, REV-114, REV-201M for Oil & Gas

📅 2026-07-22 ✍️ Novatek Electro India 📂 Blog
Multifunction Time Delay Relays REV-120, REV-114, REV-201M for Oil & Gas

REV-120, REV-114 & REV-201M multifunction time delay relays deliver on-delay, off-delay, cyclic & star-delta timing for oil, gas & petrochemical automation panels.

When a Missequenced Start Costs More Than a Relay

Consider a compressor station where three motors must start in a defined sequence — each with a minimum inter-start delay — to prevent simultaneous inrush current from collapsing the busbar voltage. If those delays are hardwired using fixed-timer relays or analogue adjustments, a single technician error during commissioning or PM can send all three motors into simultaneous star contactor pull-in. The result: overcurrent, nuisance tripping, and in worst cases, contactor weld-on in a hazardous-area panel. The protection gap is not in the overcurrent relay — it is in the timing logic upstream of it.

Across oil, gas and petrochemical facilities, factory-automation sequences — conveyor belt staging, motor star-delta starting, HVAC damper control, process-pump interlocks, and irrigation/fire-water timing — depend on accurate, repeatable time delays. A relay that drifts, offers only one timing mode, or cannot be field-reprogrammed without rewiring creates real operational risk. This is the engineering problem that the Novatek Electro REV-120, REV-114, and REV-201M multifunction time delay relays are designed to solve.

Why Timing Errors Occur — The Engineering Root Cause

Analogue RC-based timer relays suffer from component drift with temperature — a significant liability in petrochemical environments where panel internal temperatures can swing between 15 °C at night and 55 °C during summer operation. A 10 % timing drift on a 5-second star-to-delta transition can mean the motor transitions while still within the starting current plateau, causing torque shock on the coupling and mechanical wear on the driven load.

Single-mode timers compound the problem. A panel designed around a pure on-delay relay cannot be repurposed for an off-delay interlock without rewiring. In a plant where shutdown sequences must be as carefully staged as start sequences — for example, allowing a cooling fan to run for 30 seconds after a furnace burner trips — single-mode devices create hidden control gaps.

Microprocessor-based timers with digital display and selectable operating modes eliminate both problems: crystal-controlled timing removes temperature drift, and software-selectable modes allow one device to cover on-delay, off-delay, cyclic, pulse, and star-delta functions without hardware changes.

Introducing the Novatek Electro Multifunction Time Delay Relay Range

Novatek Electro — ISO 9001:2015 and CE certified, based in Delhi, India — manufactures the REV-120, REV-114, and REV-201M as microprocessor-based, panel-mount timing relays engineered for industrial control panels across demanding process industries. All three models are DIN-rail and panel-mount compatible, operate on 220–240 V AC 50/60 Hz supply, and carry a 6 A output contact rating (SPDT, potential-free).

REV-120 — Multifunction Time Delay Relay with External Input

Novatek Electro REV-120 Multifunction Time Delay Relay

The REV-120 operates across ten selectable operating modes, including on-delay, off-delay, cyclic (intermittent), pulse (on trigger rising or falling edge), and a dedicated star-delta timer mode. The star-delta mode makes it the natural choice for motor starting panels — the relay independently manages the star contactor hold time and the transition pause before delta contactor pull-in, with no additional auxiliary relay required. The time range spans 0.1 seconds to 10 days across 10 selectable ranges, giving panel designers a single device that handles both sub-second pulse timing and multi-hour process delays.

Price: Rs. 1,900 per piece (ex-GST). GST @ 18% applicable extra.

Buy REV-120 Online

REV-114 — Programmable Time Delay Relay with External Input and Display

Novatek Electro REV-114 Programmable Time Delay Relay with Display

The REV-114 extends the operating logic set to seventeen selectable algorithms, including on-delay, time delay when energising, periodic with on-delay, periodic with time delay when energising, and several advanced cyclic and pulse variants. The integrated digital display and front-panel control buttons allow in-situ adjustment and visual verification of the set time — essential in petrochemical panels where re-entry for parameter verification must be quick and unambiguous. The same 0.1-second to 10-day range applies, with 10 selectable time bands. Contact form is SPDT (2NO + 2NC), potential-free, rated 6 A.

Price: Rs. 2,050 per piece (ex-GST). GST @ 18% applicable extra.

Buy REV-114 Online

REV-201M — Dual-Channel Multifunction Time Delay Relay

Novatek Electro REV-201M Dual Channel Time Delay Relay

The REV-201M is the two-channel variant in the range, designed for commutation of 240 V AC 50 Hz as well as 24 V DC circuits with adjustable time delay. It supports seven operating algorithms: turn-on time delay, pulse relay 1, intermittent (cyclic) relay 1, star-delta operation relay, pulse relay 2, intermittent relay 2, and off-delay. The two independent channels in a single device are particularly valuable for star-delta starter panels — where star-channel and delta-channel timing logic can both be contained in one DIN-rail slot — and for HVAC control sequences requiring staggered start and stop of supply and return air fans.

Price: Rs. 2,833 per piece (ex-GST). GST @ 18% applicable extra.

Buy REV-201M Online

Key Technical Specifications — Side by Side

Parameter REV-120 REV-114 REV-201M
Supply Voltage220–240 V AC 50/60 Hz220–240 V AC 50/60 Hz240 V AC / 24 V DC
Output ContactSPDT (2NO+2NC), 6 ASPDT (2NO+2NC), 6 A2-channel, potential-free
Operating Modes10 modes incl. star-delta17 modes7 algorithms, 2 channels
Time Range0.1 sec – 10 days (10 ranges)0.1 sec – 10 days (10 ranges)Adjustable, user-defined
External InputYesYesYes
Digital DisplayYes
Channels112
Price (ex-GST)Rs. 1,900Rs. 2,050Rs. 2,833

Application Categories in Oil, Gas and Petrochemical

Conveyor Belt Sequencing

Bulk-material conveyors in petrochemical plants must start tail-to-head to prevent material pileup. A cascaded arrangement of REV-120 or REV-114 relays in on-delay mode staggers each belt motor start by a defined interval — typically 5 to 30 seconds depending on belt length — without PLC intervention. The same relays, reprogrammed to off-delay mode, allow head-to-tail sequential shutdown, ensuring all material is cleared before the tail belt stops.

Motor Star-Delta Starting

The REV-120 and REV-201M both carry a dedicated star-delta mode. In a 220–240 V AC panel, the relay manages the star contactor dwell time (typically 3–10 seconds for motors in the 5.5–75 kW range) and the transition pause before delta contactor energisation, reducing transition-transient current. The REV-201M's dual-channel design allows the star and delta timing logic to be combined in a single device, reducing panel wiring complexity.

HVAC and Ventilation Sequencing

Process-area HVAC panels in petrochemical facilities require staggered fan starts (to limit peak demand), post-shutdown purge runs (to clear residual heat), and damper-open confirmation delays before fan start. The REV-114's seventeen operating algorithms — including periodic-with-on-delay and on/off-delay modes — map directly onto these multi-step sequences within a single relay body.

Process Pump and Valve Interlocks

Pump start delays (waiting for valve-open confirmation), minimum-run timers (preventing pump short-cycling), and coolant-flow establishment delays before main process start all fall within the 0.1-second to 10-day time window of all three models. Cyclic modes support automatic drain-valve actuation on a timed schedule.

Fire-Water and Irrigation Timing

Jockey pump cyclic run-test timers, fire-water system weekly test sequences, and drip-irrigation zone timing in green-belt areas of large petrochemical campuses are all served by the cyclic and pulse modes available across the REV range.

Quick Selection Guide

Application Recommended Model Price (ex-GST)
Motor star-delta starting (single device)REV-201MRs. 2,833
Motor star-delta starting (standard panel)REV-120Rs. 1,900
Conveyor belt sequential start/stopREV-120 / REV-114Rs. 1,900 / Rs. 2,050
HVAC multi-step sequencing with displayREV-114Rs. 2,050
Cyclic process-pump run/rest timerREV-114 / REV-120Rs. 2,050 / Rs. 1,900
Irrigation zone timing, 24 V DC panelsREV-201MRs. 2,833
General process interlock delayREV-120Rs. 1,900

Why Novatek Electro?

  • ISO 9001:2015 Certified Manufacturing: Every unit is produced under a documented quality management system — relevant for vendor qualification in oil, gas and petrochemical projects where QMS certification of component manufacturers is often a procurement condition.
  • CE Marked: Demonstrates conformity with applicable European directives; relevant for export panels and EPC contractors working on internationally financed projects.
  • Made in India — Delhi: Manufactured domestically, supporting shorter lead times, local technical support, and availability through established distributor and panel-builder networks.
  • 30+ Years of Product Engineering: The REV range reflects decades of field feedback from Indian industrial panel builders — the operating modes and time ranges are not theoretical; they are matched to real sequencing requirements encountered in process-industry panels.
  • Accessible After-Sales Support: Direct technical support available for panel builders, OEM integrators, and consulting engineers through the contact channels below — not a generic call-centre response.
Ready to Specify or Purchase?

The REV-120, REV-114 and REV-201M are available for immediate purchase through our authorised online distributor. For bulk orders, panel-builder pricing, or technical application support, contact our engineering sales team directly.

Shop All Models at Intelli-Electro Email: sales@novatek-electro.in Call: +91-7840054744

Frequently Asked Questions

Q: What is the difference between REV-120 and REV-114 — which should I specify for a conveyor sequencing panel?
A: Both models share the same supply voltage (220–240 V AC), contact rating (6 A SPDT), and time range (0.1 sec to 10 days). The REV-114 offers 17 operating algorithms versus 10 on the REV-120, and critically includes an integrated digital display with front-panel buttons for in-situ time adjustment and visual verification. If your panel requires frequent parameter changes during commissioning or operational repurposing, the REV-114 at Rs. 2,050 is the better choice. For fixed-sequence conveyor staging where parameters are set once at commissioning, the REV-120 at Rs. 1,900 is cost-effective and fully adequate.
Q: Can the REV-201M replace two separate star and delta timer relays in a motor starting panel?
A: Yes — this is one of its primary design intents. The REV-201M has two independent output channels and includes a dedicated star-delta operating algorithm. In a standard star-delta starter panel, the star-channel dwell time and the transition pause before delta pull-in are both managed within one REV-201M body, reducing the relay count, DIN-rail space, and inter-device wiring compared to using two separate single-channel timers.
Q: What time accuracy can I expect from these microprocessor-based relays compared to analogue drum or RC-type timers?
A: Microprocessor-based timing with crystal oscillator reference delivers substantially better accuracy and temperature stability than analogue RC-based timers, which can drift by several percent across temperature. In process-industry environments where panel internal temperatures vary significantly between seasons or between day and night, the REV-series devices maintain timing accuracy across the operating range — making them suitable where a defined transition time (such as a star-to-delta switch) is critical to motor and load protection.
Q: The REV-201M mentions 24 V DC compatibility — does this mean it can be powered from a control-circuit DC supply in a PLC-integrated panel?
A: Yes. The REV-201M is designed for commutation of both 240 V AC 50 Hz and 24 V DC circuits, making it compatible with 24 V DC control-bus architectures common in PLC-integrated panels and in intrinsically safe barrier systems found in oil and gas process panels. The REV-120 and REV-114 operate on 220–240 V AC 50/60 Hz supply only.
Q: What does 'external input' mean on the REV-120 and REV-114, and how is it used in practice?
A: The external input is a control-contact input terminal that triggers the timer's operating mode — for example, a start button, a PLC digital output, a float switch, or a flow-switch contact. In on-delay mode, the timer starts counting when the external input is closed. In off-delay mode, the timing begins when the external input opens. This allows the relay to respond to process-derived signals rather than operating purely on its own internal clock, which is essential for interlocked process sequences.
Q: Are these relays suitable for use in an oil and gas panel installed in Zone 2 classified areas?
A: The REV-120, REV-114 and REV-201M are standard industrial control relays designed for installation inside control panels — not as standalone devices in classified hazardous areas. In Zone 1 or Zone 2 installations, they should be mounted in an appropriately rated Ex-e or Ex-d enclosure, or in a purged and pressurised panel room, as per IEC 60079 requirements. Consult your area-classification authority and EPC contractor for enclosure selection. The relay itself provides accurate timing signals to contactors mounted in appropriately protected housings.
Q: Can I use multiple REV-120 relays in cascade to create a multi-step sequential start for more than two conveyors?
A: Yes — this is standard panel-design practice. The output contact of REV-120 (unit 1) triggers the external input of REV-120 (unit 2), which in turn triggers unit 3, and so on. Each relay in the cascade contributes its own independently adjustable on-delay before energising its load contactor. Since each relay covers 0.1 sec to 10 days, the inter-start delay for each belt can be set individually to match the specific inertia and belt-length characteristics of that conveyor section.
Q: What is the contact rating of the output relay, and can it directly switch a motor contactor coil?
A: The output contact on all three models is rated at 6 A, SPDT (2NO + 2NC), potential-free. This is sufficient to directly switch standard IEC contactor coils — a typical AC contactor coil draws well under 1 A at 220–240 V AC — without an intermediate interface relay. For high-inrush coil loads or where electrical isolation is required, an interface relay or an AC contactor rated above 6 A should be inserted between the timer output and the load. Never use the timer contact to directly switch motor windings.
Q: What is the recommended star-to-delta transition time for typical induction motors, and how do I set it on the REV-120?
A: For cage induction motors between 5.5 kW and 75 kW, star-to-delta transition is typically set between 3 seconds and 12 seconds, depending on the motor datasheet and the load inertia. The motor should be allowed to accelerate to approximately 75–80% of synchronous speed in star before the transition — too short a dwell causes high transition-transient current; too long increases thermal stress on star contactor and winding. On the REV-120, select star-delta mode, set the time range to the appropriate seconds band (the 10 selectable ranges include sub-second through multi-minute bands), and adjust the set-point via the front-panel potentiometer or digital interface as applicable to your unit revision.
Q: Can the REV-114 be used for HVAC panel fan post-run (off-delay) after a process shutdown signal?
A: Yes — the REV-114 supports off-delay (time delay when de-energising) as one of its 17 operating algorithms. When the process shutdown command drops the supply to the external input, the relay output remains energised for the configured post-run period before opening. This keeps the supply fan or exhaust fan running to purge residual heat or fumes after burner or process shutdown — a standard ATEX and ASHRAE design requirement for process-area ventilation systems.
Q: Prices listed are ex-GST — what is the final price including GST, and are these available for bulk OEM purchase?
A: GST at 18% is applicable on all three models. Final prices including GST are approximately Rs. 2,242 for REV-120, Rs. 2,419 for REV-114, and Rs. 3,343 for REV-201M per piece. For OEM, panel-builder, or project-quantity procurement, contact the sales team at sales@novatek-electro.in or +91-7840054744 to discuss volume pricing and delivery terms. Online retail purchase is available at intelli-electro.com.
Q: Is there a cyclic (intermittent) mode suitable for automatic jockey-pump run-test timers in a fire-water system?
A: All three models support cyclic or intermittent modes. In cyclic mode, the relay alternates between on-time and off-time periods on a continuous loop as long as supply is present. For a jockey-pump run-test application, the on-time can be set to the required test-run duration (for example, 30 seconds) and the off-time to the test interval (for example, 24 hours — well within the 10-day maximum). The REV-114 with its digital display provides clear visibility of the current cycle status, which is useful for operators verifying the pump test schedule during routine rounds.
Q: How does the REV-114's digital display help during panel commissioning in the field?
A: During commissioning, timing parameters often require adjustment as actual load behaviour is observed — a motor that takes longer to accelerate than anticipated, or a process valve that opens more slowly than the design assumption. The REV-114's digital display shows the current set time and the elapsed time during the timing cycle, allowing the commissioning engineer to verify operation and make adjustments directly at the panel face without extracting the relay or using a laptop. This is particularly valuable in process-industry panels where access may be restricted after commissioning.
Q: What certifications do these relays carry, and is documentation available for project vendor qualification?
A: Novatek Electro holds ISO 9001:2015 quality management system certification and CE marking for its product range. Technical datasheets, connection diagrams, and dimension drawings for REV-120, REV-114 and REV-201M are available for download from the product pages. For formal vendor qualification packages required by oil, gas and petrochemical EPC contractors or end-user procurement teams, contact sales@novatek-electro.in with your specific documentation requirements.
Tags: "REV-120 REV-114 REV-201M multifunction time delay relay star-delta timer sequential control factory automation oil gas petrochemical conveyor sequencing HVAC control process delay relay Novatek Electro rev_automation combo:rev_automation|problem_solution|industry-oilgas Novatek Electro India"
Share this article
WhatsApp LinkedIn Twitter/X

Related Articles

Multifunction Time Delay Relays REV-120, REV-114, REV-201M for Oil, Gas & Petrochemical Automation
Multifunction Time Delay Relays REV-120, REV-114, REV-201M for Oil, Gas & Petroc
2026-09-09
Single Phase Voltage Relays for Hotel Pump Protection — RN-119 & RN-102
Single Phase Voltage Relays for Hotel Pump Protection — RN-119 & RN-102
2026-09-06
Overload Relays & Power Controllers for Food Processing & Cold Chain
Overload Relays & Power Controllers for Food Processing & Cold Chain
2026-09-03